Monday, July 21, 2008
The Finished Project
Walkway
After we laid the stones we had to fill with cement. We had a type of cement that was like sand. We filled all the cracks with the concret mixture and then swept the stones clean and leveled the mixture. Then you very gently soak the mixture with water and wait for it to harden. Sounds easy, but definitely it was not.
Me spreading and leveling the conrete mixture. This was the end of phase one of the walkway.
After phase one, we had to stop because we were out of forms to hold the conrete in. So, it was time to wait and hope that all turned out okay.
The Walkway Begins
Tuesday, July 15, 2008
Making Stepping Stones
Me preparing the 'work space'!
We got home from the mall and it was time to make the stepping stones. It was pooring down rain outside, which is where we should have been to do this, but we couldn't wait on the rain to stop because we HAD to get these done so they would be dry in time for their addition to the 'backyard project'.
Next up was Stephanie. She is such a big girl and understood exactly what she was to do. Her hand and footprint turned out perfect. So, off she went to rinse off too before we embarked on the decorating.
Finally, I crammed Katie's name and the year('08 was all that would fit) onto her stone and we had one completed stone. I then gave Stephanie and popsicle stick and tried to teach her the art of writing with it. After smoothing and resmoothing many times, I finally decided to try a pencil...MUCH BETTER. After much work trying to get a long name in an already small space, the name was finally there...and I crammed in '08 again.
At last, we are done. I think they turned out pretty good and just wait until you see where they are going!!!!